Pipelines & Energy

Keep the line covered, supported and in service.

Creeks, rivers and drainage areas can move long after a pipeline is installed. When cover is lost or banks retreat, pipelines can be exposed to vehicles, vandalism and, in some cases, loads they were never designed to withstand.

Start a Conversation

What we see in pipelines & energy.

What you're seeing

The pipeline is exposed at a water crossing.

Cover has washed out and the pipeline is visible in the bed or banks of a water crossing.

What's driving it

Bed degradation and scour at the crossing, often set off by changes upstream or downstream that lower the channel.

How we solve it

We investigate the crossing and trace the cause, then engineer and permit protection that restores cover and holds the bed in place.

What you're seeing

A span needs support.

The designed span in a ravine has eroded because the ground beneath it has washed away and the span needs mechanical support.

What's driving it

An engineered crossing that calls for support, or flow that has removed material beneath the line faster than the channel can rebuild it.

How we solve it

We engineer and install support under the span and, where erosion created the condition, stabilize the surrounding site.

What you're seeing

The bank is eroding due to lateral migration.

The outside bend is eroding and endangering the nearby pipeline.

What's driving it

High-velocity flow concentrated against the bank as the channel migrates.

How we solve it

We model how the river is behaving and redirect the flow away from the bank, armoring it where the river leaves no room to recover.

What you're seeing

A knickpoint is moving toward the pipeline.

A step or drop in the channel bed is working its way upstream toward the pipeline crossing.

What's driving it

A lowered channel downstream. Every flow event pushes the drop further upstream.

How we solve it

We engineer grade control that stops the knickpoint where it is and stabilizes the channel through the crossing.

In the field

Before: A pipeline exposed where a creek has cut into its bankBefore
After: The same bank rebuilt as a stepped wall over the lineAfter

Meandering creeks see changing water levels and flow rates, and they can expose a pipeline quickly. We rebuilt this bank as a stepped wall over the line.

Before: A pipeline suspended over an eroded drainageBefore
After: The same crossing with the line supported and the channel beneath it armoredAfter

Over time, erosion can leave a pipeline spanning a ravine it was never meant to cross. That calls for prompt work: support beneath the pipeline and armoring around it.

Before: A deep headcut cutting back through open groundBefore
After: The same headcut stopped with stepped grade controlAfter

A headcut was cutting its way upstream through open ground, taking more land with every storm. We installed stepped grade control to stop the knickpoint and step the water down safely to the channel below.

Before: A bank cut away beside a road crossingBefore
After: The same bank rebuilt and armored beside the crossingAfter

Flow through this road crossing had cut the bank beside it back toward the road. We rebuilt the bank and armored it where the flow leaves the crossing.

Before: A drainage channel eroded into red clay, with an exposed lineBefore
After: The same channel rebuilt as a lined channelAfter

Below a roadway, runoff cut this drainage channel deep into red clay and exposed the line running through it. We rebuilt it as a lined channel, from the road culvert down, that holds its grade.

Before: An exposed line in a creek crossing choked with debrisBefore
After: The same crossing rebuilt over new culvertsAfter

Debris and high flows scoured this creek crossing until the line beneath it was exposed. We restored the cover and rebuilt the crossing over new culverts.

Before: A riverbank retreating beneath farmlandBefore
After: The same bank five years later, rebuilt and vegetatedAfter

The river was taking this bank, and the farmland above it, with every high water event. Five years after the work, the bank is rebuilt and green.

Before: Eroded drainage beneath pipe racks at a processing plantBefore
After: The same drainage lined beneath the pipe racksAfter

Runoff at this processing plant had carved the drainage under the pipe racks into open ditches. We lined the channel to protect the ground the supports stand on and mitigate sediment flow.

Before: A riverbank eroding beneath a transmission lineBefore
After: The same bend with structures installed along the bankAfter

When a river starts cutting toward a transmission line, the structures beside it are next. We armored the banks and channels to protect the utility infrastructure.

How we work

One team, from site investigation through construction.

Whatever the industry, every project follows the same six steps, and our own people carry it through each one. Nothing is handed off to another firm along the way.

  1. Site Investigation
  2. Scoping & Root Cause
  3. Engineering & Drawings
  4. Permitting & Approvals
  5. Construction
  6. Long-Term Protection

Exposure? Free span? Bank retreat?

Tell us what you're seeing.

Send us the location, what concerns you and any photos, surveys or history you have. We'll tell you how we'd approach it.